Nordex Group Receives 96 MW Order in Mexico

Source: www.gulfoilandgas.com 3/25/2021, Location: South America

The Nordex Group has received an order for the delivery of 20 N155/4.X turbines in Mexico. The turbines will be delivered in a project-specific mode of 4.8 MW, resulting in a total rated capacity of 96 MW for the wind farm. The order also includes a full two-year service of the turbines.

The project name and customer are undisclosed as per customer request.

The wind farm will be built in the north of the country. The location is characterized by good average wind speeds of 8 meters per second.

The Nordex Group will install the 4.8 MW turbines on 120-metre-high concrete towers in the course of this year, which the Group produces locally in the country. The company also manufactures the rotor blades locally at its Mexican plant in Matamoros.


Scotland >>  11/4/2024 - Proteus Marine Renewables (PMR) has signed an MOU with SKF and GE Vernova’s Power Conversion business. The MOU sets out a framework for a potential al...
Sweden >>  11/4/2024 - SKF has signed a Memorandum of Understanding (MOU) with Proteus Marine Renewables (PMR) and GE Vernova’s Power Conversion business. The MOU sets out a...

Ireland >>  10/24/2024 - Energia Renewables are pleased to announce that Crossmore Wind Farm has reached a landmark milestone with the successful installation of the seventh a...
Japan >>  10/21/2024 - Building on the success of our AR500 tidal project in Japan, we’re excited to share that Proteus has hit another important Phase 2 milestone on route ...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.