Equinor – Johan Castberg – Subsea Production System

Source: www.gulfoilandgas.com 5/3/2021, Location: Europe

The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on the company’s management of design engineering and fabrication of a subsea production system for Johan Castberg.

Objective
The objective of the audit was to investigate whether Equinor's follow-up of process safety, risk and barrier management, emergency preparedness, degradation mechanisms and assembly of a subsea production system for Johan Castberg complies with the company's own and the regulatory requirements.

Result
No regulatory non-conformities were identified during the audit.

An improvement point was identified concerning non-conformity management.

What happens now?
We have asked Equinor to provide us with its assessment of the improvement point observed. The reply deadline is set at 15 June 2021.


Norway >>  9/10/2021 - Aker Solutions has been awarded a large[1] topside modification contract by ConocoPhillips Skandinavia AS for Tommeliten Alpha, offshore Norway. Combi...
Portugal >>  8/30/2021 - LyondellBasell (LYB) announced that Repsol has selected LyondellBasell’s leading polypropylene (PP) technology for the expansion of their existing fa...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.