Rock-to-rock Remediation Operations using PWC® & Hydraulic Work-over unit (HWO)

Source: www.gulfoilandgas.com 5/25/2021, Location: Europe

After a review of a historic well data, a major UKCS Operator identified the requirement for remedial barrier placement on several of the platform wells to be permanently abandoned.

Due to the small platform footprint and available deck space, a P&A specific Hydraulic Workover Unit (HWO) was chosen by the client as the optimal solution for performing the downhole operations.

Check our out latest case study, linked below, which outlines, in detail how HydraWell flawlessly executed PWC operations from HWO® unit for the client.


Brazil >>  8/15/2022 - Petrobras informs that, as a result of the progress of the development project for the Búzios field, in the Santos Basin pre-salt area, it signed a co...
United Arab Emirates >>  8/11/2022 - Abu Dhabi National Oil Company (ADNOC) announced today a $1.17 billion (AED4.3 billion) contract for the hire of 13 self-propelled jack-up barges to d...

Germany >>  8/8/2022 - TenneT will soon be reliably bringing even more green wind power from the German North Sea to land via the direct current connection DolWin6. Europe’s...
United Kingdom >>  8/4/2022 - Getech, the geoenergy and green hydrogen company, has signed a $1.1 million multi-year contract with a major international energy company for its 'Glo...

United Kingdom >>  7/27/2022 - Petrofac, a leading provider of services to the global energy industry, is set to take its tenure supporting the Kittiwake platform into two decades, ...
Australia >>  7/25/2022 - Heerema Marine Contractors has been awarded a decommissioning contract by Woodside Energy that includes the integrated engineering, preparation, remov...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.