Gulf Oil and Gas accountACCOUNT

Volga Gas Updates Its Operations in Vostochny-Makarovskoye

Source: www.gulfoilandgas.com 9/16/2009, Location: Asia

Volga Gas and its subsidiaries (together, the "Group") are involved in the exploration, evaluation and production of, oil and gas in four licenses in the Volga Region of European Russia.

The VM # 1 and VM # 2 wells were drilled and tested during 2008. These two wells have now been connected by inter-field pipeline to the plant gate at the Dobrinskoye Gas Processing Unit ("GPU").

In February 2009 drilling on the VM # 4 well was completed. As reported at the time, the well found only a limited eight metres of effective pay. The VM#4 well has been temporarily suspended and may be re-drilled as a sidetrack to locate more of the productive reservoir.

As construction of the GPU has progressed, commissioning procedures have commenced and the plant is being tested with production from the Dobrinskoye field, which is owned by Trans Nafta. It is envisaged under an agreement with Trans Nafta that the GPU will be transferred into a joint venture, 75% owned by Volga Gas. Negotiations in relation to this are in progress. The Group has applied to the government authorities to commence production from the VM#1 and VM#2 wells and hopes to be able to announce start up of the field early in 2010.

Drilling News in Russia >>

United Kingdom >>  12/11/2019 - Rockrose Energy plc (RRE), the independent oil and gas company, is pleased to announce the Noble Houston Colbert jack-up drilling rig is preparing to ...
Australia >>  12/10/2019 - Vintage Energy Ltd (VEN), as operator of the ATP 2021 Joint Venture (Vintage 50%, Metgasco Ltd 25%, Bridgeport (Cooper Basin) Pty Ltd 25%), is pleased...

Gabon >>  12/10/2019 - Panoro Energy is pleased to announce the successful completion of the DTM-4H well, the first of the phase 2 Tortue development wells. The well was dri...
Norway >>  12/9/2019 - Equinor Energy AS, operator of production licence 090, has concluded the drilling of appraisal well 35/11-23 A. The well was drilled about 3 kilometre...

Australia >>  12/8/2019 - Norwest Energy has approved a joint venture resolution to drill the EP368 exploration well in H1 2020 at Lockyer Deep. The well location is situated a...
Norway >>  12/8/2019 - The Norwegian Petroleum Directorate has granted ConocoPhillips Skandinavia AS a drilling permit for well 25/7-9 S, cf. Section 15 of the Resource Mana...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 |

Oil & Gas Projects in Russia >>

More News

Related Links

AZ BD BN CN GE HK ID IN IR JP KH KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright 2019 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.