As part of the audit of drilling facilities at the Salmanovskoye (Utrenny) oil and gas condensate field, a joint commission of Arctic LNG 2 LLC and PAO NOVATEK inspected Uralmash 6000/400 EK-BMCh drilling rigs at well pads No. 3, 4 and an inspection of the service contractors' site.
According to the results of the audit, the drilling crew # 16 of the foremen Rakhmonov I.Sh., Kalandarova Zh. R., Mktrchyana G.B. and brigade No. 15 of masters A.G. Kurbonov, G.K. Rakhmonov. and Absalyamova I.R. received positive feedback from the Customer for their high professionalism and production culture.
Director of the branch Yusupov I.U. :
“I would like to thank the team for excellent performance on one of the most northern and harsh ERIELL projects! The morning oil and gas condensate field is located on the Gydan Peninsula, where strong winds and low temperatures prevail for most of the year. The project involves three fully enclosed drilling rigs, two of which were designed at the Russian Uralmash plant. The main emphasis of such installations is made to improve the safety and comfort of the drillers, as well as to minimize equipment downtime due to extreme weather conditions. "