At the Ust-Yamsoveyskoye field, a record increase in ROP was obtained in cooperation with ASB, which provides services for the use of an electronic automatic drilling system.
Yavorskiy A.A. , Chief Technologist of ERIELL NEFTEGAZSERVICE:
“We are constantly working to improve production performance. With the use of an electronic automatic drilling system, we managed to obtain high rates of ROP, which led to a decrease in the time of mechanical drilling in comparison with previously drilled wells:
- reduction of drilling time by 20.46 hours due to increased mechanical speed of clean chiselling;
- 100% compliance with the set curvature parameters;
- additional technological control by the drilling automation engineer;
- absence of incidents related to the human factor during mechanical drilling.
We would like to thank the drilling support center of the Novourengoy branch and the ASB company for the implementation of the automation process and excellent results! "