Global Offshore Awarded Array Cable Installation Contract at Offshore Wind Farm

Source: www.gulfoilandgas.com 9/6/2021, Location: Europe

Global Offshore, a leading provider of cable installation, repair and trenching services to the offshore renewables, utilities and oil & gas markets, and part of the Global Marine Group, has been awarded a contract for the installation and burial of 27 array cables at Parkwind’s Arcadis Ost 1 offshore wind farm.

The scope of work will see Global Offshore carry out the project management and marine engineering; cable protection systems supply and installation, pre and post lay surveys, cable loading and laying, cable burial and post-burial survey.

As part of the turnkey package, Global Offshore’s sister company, OceanIQ, will provide route engineering services for the project, with another of Global Offshore’s sister companies, CWind, providing crew transfer vessels and cable pull-in services.

Global Offshore will be utilising two of Global Marine Group’s versatile cable ships, Normand Clipper and Global Symphony, with work at the site commencing in the second half of 2022.

“We are delighted to confirm this latest contract win, which will see us to provide the unsurpassed service to Parkwind that our customers have come to expect from Global Offshore. We have been providing cable trenching, installation, burial, management, repair, and maintenance services to the offshore wind industry since the installation of the first European offshore wind farm two decades’ ago.

“With a dedicated in-house engineering department, an experienced project management team, and a wealth of capable offshore personnel, alongside specialist offshore assets, we are confident in our ability to ensure the success of this project.”

Mark Gillespie, Managing Director at Global Offshore
Elien Van Winckel, cable package manager at Parkwind said: “We are pleased to award the Arcadis Ost 1 cable installation contract to Global Offshore. They have been selected for their extensive expertise and know-how in dealing with particularly challenging soil conditions.”

Arcadis Ost 1 is a 257 MW offshore wind project developed by Parkwind. The wind farm will be located in the Baltic Sea, northeast of the island of Rügen in Germany.


Netherlands/Holland >>  10/21/2021 - For the offshore wind farm Luchterduinen in The Netherlands, Jan De Nul was requested by Eneco to rebury a section of an existing export cable. To thi...
France >>  10/14/2021 - The Correll Group – Electrical Engineering Division has been awarded a contract by Prysmian Group for the pull-in of two 225 kV HVAC export cables (ea...

United States >>  10/7/2021 - Prysmian Group, the world leader in energy and telecom cable systems industry, announced it is investing additional $100M over the next two and half y...
Australia >>  10/4/2021 - - Deep-water high voltage dynamic cable will be used to power and control subsea compression of natural gas.
- Deployment will be a major strate...


United States >>  10/1/2021 - Prysmian Group, world leader in the energy and telecom cable systems industry, announces the obtainment of the Notice to Proceed for the approximately...
United Kingdom >>  9/28/2021 - JDR Cable Systems (JDR), the global subsea cable and umbilical supplier and servicer, part of the TFK Group, has announced its plans to open a new sta...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.