Wartsila to Provide Optimal Propulsion Performance for New Wind Turbine Installation Vessel

Source: www.gulfoilandgas.com 12/8/2021, Location: Asia

The technology group Wartsila will supply the seven thrusters required for a new Wind Turbine Installation Vessel (WTIV) being built at the Daewoo Shipbuilding & Marine yard in South Korea for Eneti Inc. By providing outstanding thrust, robust station-keeping capability and efficient transit operation, the Wartsila thrusters will enable optimal propulsion performance for the vessel. The order with Wartsila was placed in October 2021. There is an option for a second vessel.

The next-generation vessel features a Gusto 16000X design and will have advanced lifting capabilities and high energy efficiency. Wartsila’s advanced lightweight thruster configuration meets the design parameters’ performance standards.

In particular, Wartsila’s proven retraction system combined with an energy efficient 8-degree tilt are key factors in the thrusters’ enablement of effective and reliable station-keeping performance. The tilt delivers up to 23 percent higher effective thrust than non-tilted thrusters, while reducing the power requirement and fuel consumption. The retractable thrusters have a combined electric steering and retraction system which saves space and weight, and which has fewer components for greater reliability.

“We are very familiar with the quality and efficiency of Wartsila’s thrusters. They can be trusted to ensure performance in all sea conditions, which is essential in a vessel of this type,” says Min Yun, The head of DSME Offshore Machinery Procurement Department.

“In line with our commitment to environmental sustainability, our focus today is on highly efficient technologies capable of delivering excellent performance. We are assured that the Wartsila solutions meet this requirement,” says Emanuele A. Lauro, Eneti Chairman & CEO.

“Safety and reliability are central needs for modern jack-up WTIVs, and our thruster package is optimized to deliver them. Furthermore, by ensuring efficient free sailing and outstanding dynamic positioning, regardless of the sea conditions, we are contributing to the decarbonization of the maritime sector,” says Roger Holm, President Marine Power & EVP Wartsila Corporation.

The scope includes six Wartsila WST-32 thrusters fitted with a modern electric steering system for a lower lifecycle cost, high reliability, and reduced energy consumption, and one Wartsila WTT-36 thruster All seven comply with applicable environmental regulations with the use of Environmentally Acceptable Lubricants (EAL), and are scheduled for delivery to the yard during the first quarter of 2023. The vessel is expected to be delivered to the owner in the latter part of 2024.

This is the fourth WTIV with Wartsila thrusters contracted during 2021, thus emphasising Wartsila’s leading position in this field.


Canada >>  8/3/2022 - Capstone Green Energy Corporation (CGRN) secured a follow-on order for two C200S high-pressure natural gas microturbine systems. The customer is a Can...
United Kingdom >>  8/2/2022 - Dagang NeXchange Berhad (“DNeX”), via its subsidiary Ping Petroleum UK PLC (“Ping”), has signed a Memorandum of Understanding (“MoU”) with Cerulean Wi...

Malaysia >>  8/1/2022 - Capstone Green Energy Corporation's distributor in Malaysia and Brunei, Sekito, has secured an order for a 200 kW microturbine-based system for an oil...
Russia >>  7/29/2022 - Concrete was poured for the first wind turbine foundation at the Trunovskaya Wind Farm in the Stavropol Krai (Southern Russia).
<...


China >>  7/21/2022 - Representatives from Van Oord, DNV, and CIMC Raffles attended the commencement ceremony for the Van Oord JUV BOREAS, a wind turbine installation vesse...
Taiwan >>  7/21/2022 - Taiwan’s Formosa 2 offshore wind project has passed two major construction milestones, completing the installation of 12 turbines and successfully tra...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.