Carnarvon Energy Limited is pleased to provide an update on the Buffalo-10 well.

Progress
Since the last report, the Conductor was installed and cemented in place, and the 17 ½” hole was drilled down to section total depth of around 804 metres Measured Depth (“MD”).

Forward Plan
Set and cement the 13 3/8” casing and install wellhead, after which the rig will drill ahead in 12 ¼” hole to approximately 2,800 metres MD before setting the 9 ?” casing. No hydrocarbons are anticipated to be intersected in this drilling section.