Vestas Secures 201 MW Order of EnVentus Turbines in the USA

Source: www.gulfoilandgas.com 3/31/2022, Location: North America

Vestas has received a 201 MW order to power an undisclosed wind project in the USA. The order consists of 33 V162-6.2 MW wind turbines in 6.0 MW operating mode and one V136-3.45 MW turbine.

The order includes supply, delivery, and commissioning of the turbines, as well as a 15-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimised performance of the asset.

Turbine delivery begins in the fourth quarter of 2022 with commissioning scheduled for the fourth quarter of 2023.


United States >>  6/21/2022 - Infinity Turbine LLC, is introducing the Gas Leverage Turbine (GLT).

Considered a hybrid between Brayton Cycle and Organic Rankine Cycle, t...

Canada >>  6/17/2022 - Capstone Green Energy Corporation, a global leader in carbon reduction and on-site resilient green energy solutions, announced that Horizon Power Syst...

United States >>  6/17/2022 - Rivian announced plans for a large-scale wind turbine at its Normal manufacturing campus that is intended to provide clean energy to enable new R1 veh...
United States >>  6/17/2022 - Rivian announced plans for a large-scale wind turbine at its Normal manufacturing campus that is intended to provide clean energy to enable new R1 veh...

Colombia >>  6/16/2022 - The Nordex Group wins orders in Colombia: Celsia Colombia S.A., an electricity producer and distributor, has ordered 63 N155 turbines with a total of ...
Netherlands/Holland >>  6/16/2022 - The Hollandse Kust Zuid offshore wind farm in the Netherlands will use a new type of wind turbine blades that can be recycled. The blades are made wit...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.