United Oil and Gas Announces AJ-14 Development Well Update

Source: www.gulfoilandgas.com 8/4/2022, Location: Africa

An update on the drilling of the Al Jahraa-14 development well (AJ-14) in the Abu Sennan licence, onshore Egypt, is being released by United Oil & Gas Plc ("UOG"), a developing oil and gas firm with a portfolio of production, development, exploration, and appraisal assets. The licence, which is run by Kuwait Energy Egypt, is owned by United and has a 22 percent working stake in it.

Summary

- AJ-14 encountered seven metres of net oil pay in the Primary Abu Roash C ("ARC") reservoir
- Planned testing programme to include both Primary (ARC) and Secondary Abu Roash G ("ARG") targets
- AJ-14 is the seventh successful development well at Abu Sennan since United acquired its interest in the licence

The AJ-14 development well was primarily drilled to intersect the ARC reservoir, targeting reserves from an undrained area of the Al Jahraa Field identified from reservoir and simulation modelling work. The well safely reached total depth of 3619 metres ahead of schedule and under budget. A full logging suite was acquired through the ARC and 7 metres of good quality net oil pay has been interpreted in the reservoir, in line with the higher end of the pre-drill estimates.

The secondary ARG target was encountered 13 metres updip of the Al Jahraa-12 well, which was interpreted to have intersected an oil-water contact in this reservoir. Due to technical difficulties whilst running the logging tools a full logging suite was not acquired over the ARG interval in the AJ-14 well. However, there was sufficient encouragement from the Logging While Drilling tools to indicate potentially hydrocarbon-bearing reservoir, and to include the ARG in the testing programme.

Both the primary and secondary targets of the well are now planned to be tested and completed. If the testing is successful from either target, the well will be brought immediately onstream through the existing facilities, adding additional production and revenue for United. United will update the market on these results in due course.

Continuing Egypt drilling programme

The Sino Tharwa-1 rig used to drill AJ-14 will now be used to drill the ASH-4 development well, which is targeting 2.2 million barrels gross mean recoverable reserves in an undrilled compartment of the ASH Field. The rig move is expected to be performed over the next few weeks, with the well to spud shortly thereafter.

Brian Larkin, CEO commented:

"This is the seventh consecutive successful development well on the Abu Sennan licence since 2019. With oil prices remaining high, and the speed with which additional production can be quickly brought on stream through existing facilities, Abu Sennan's strong cash generation and extensive reserve and prospect inventory provides a solid foundation on which to build United's strategy. We are very excited about the remaining wells in the 2022 drilling programme, with the ASH-4 development well targeting 2.2 million barrels gross before the drilling of the final well in our 2022 programme, the high impact exploration well ASF-1X which is targeting over 8 million barrels gross."


Egypt >>  8/4/2022 - An update on the drilling of the Al Jahraa-14 development well (AJ-14) in the Abu Sennan licence, onshore Egypt, is being released by United Oil & Gas...
Nigeria >>  7/29/2022 - San Leon, the independent oil and gas production, development and exploration company focused on Nigeria, notes the announcement made by Decklar Resou...

Ivory Coast (Cote D'Ivoire) >>  7/28/2022 - Eni has successfully drilled the Baleine East 1X well, the first exploration well in block CI-802 and second discovery on the Baleine structure, offsh...
Algeria >>  7/25/2022 - Eni and SONATRACH announce a further discovery in Sif Fatima II concession, located in the Berkine North Basin in the Algerian desert. The Rhourde Oul...

Australia >>  7/20/2022 - • Strong performance observed from the W6 Cadda gas discovery which flowed at a maximum recorded rate of 35 mmscfd.
• Comingled testing of the Ca...

Cuba >>  7/18/2022 - Highlights
- Logging operations completed and 11-3/4” casing run to 1243 metres
- Drilled ahead to 1698 metres at which point the drill st...





Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.