Newfield Makes Commercial Discovery in Pearl River Mouth Basin

Source: www.gulfoilandgas.com 9/9/2009, Location: Asia

Newfield Exploration Company announced its second drilling success on Block 16/05, located in the Pearl River Mouth Basin in China. The LF 7-1 well tested a single zone at 6,000 BOPD (35 degrees API gravity oil), which was the maximum limit of the test equipment on location.

The LF 7-1 well, located in approximately 350 feet of water, was drilled to a total depth of nearly 10,000 feet and encountered more than 75 meters (approximately 250 feet) of high-quality oil pay in multiple sands. The well was drilled to test a downthrown anticline and was an offset to Newfield's 2008 oil discovery - the LF 7-2. Success with the LF 7-1 well set up a deeper oil prospect within the same fault trap, which the Company may test in 2010 through a down-dip sidetrack of the LF 7-1 well.

"Our two successes on Block 16/05 confirm that we have a commercial oil development with considerable running room," said William Schneider, Newfield's Vice President - Onshore Gulf Coast and International. "We estimate that the gross reserves associated with our two discoveries to date are in excess of 30 MMBbls. This development will provide significant new oil production for Newfield beginning in 2012. We are very encouraged by this discovery and its implications for our remaining prospects on this block and we expect an active drilling campaign here over the next several years."

In 2007, Newfield acquired 200 square kilometers of new 3-D seismic data to better assess this structural complex. There are numerous independent untested structures identified on the 3-D survey analogous to this discovery and additional drilling is planned. The LF 7-6 structure, located 15 kilometers to the northeast, is planned for drilling in 2010.

The China National Offshore Oil Corporation (CNOOC) has the right to participate in any development with a 51% interest.

East Belumut Phase II, offshore Malaysia

Newfield also announced plans to accelerate by approximately six months the timing on its "Phase II" development of the East Belumut oil field, located on PM 323 offshore Malaysia. As a result, the Company will invest $18 million (net) to drill three development wells in late 2009 from its existing production platform. An additional $18 million will be invested in early 2010 to drill three additional development wells. It is estimated that the six-well drilling campaign will increase 2010 oil production by an additional 1 MMBbls (net).

Newfield will fund the 2009 portion of this investment within its current capital budget of $1.45 billion. Newfield is the operator of PM 323 with a 60% interest.


Norway >>  5/24/2022 - The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 6507/2-6, cf.
Cuba >>  5/23/2022 - Melbana Energy Limited is pleased to provide this update on its two well exploration drilling program in its Block 9 contract area, onshore Cuba (Melb...

Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Aker BP ASA drilling permit for well 6507/3-15 and well 6507/3-16, cf. Section 13 of the Resourc...
Norway >>  5/23/2022 - The Norwegian Petroleum Directorate (NPD) has granted Equinor Energy AS drilling permit for well 30/3-11 S, cf. Section 13 of the Resource Management ...

Canada >>  5/19/2022 - PetroTal Corp. is pleased to announce that Q1 2022 results will be released on May 26, 2022, along with an extended investor webcast. Additionally, th...
Egypt >>  5/18/2022 - SDX Energy Plc (SDX) is pleased to announce the spudding of the MSD-24 infill development well on the Meseda field. This well is the fourth in a fully...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.