Gulf Oil and Gas accountACCOUNT

Matra Petroleum Ready to Spud Sokolovskoe Well 13

Source: www.gulfoilandgas.com 10/21/2009, Location: Asia

Further to the announcement of 30 September, Matra Petroleum announces that due to continuing operational requirements of the third party, the interim generator has not yet been made available.

In the meantime, the rig has been made ready for spud and the local electricity supply has now been hooked up to the well site. The only outstanding issues are a final inspection of the rig and electricity supply by local regulatory authorities. While these final approvals are anticipated later this week the timing is outside the company’s direct control.

Drilling News in Russia >>

Turkey >>  2/20/2019 - Valeura Energy Inc., the upstream natural gas producer focused on appraising and developing an unconventional gas accumulation in the Thrace Basin of ...
Australia >>  2/19/2019 - Equinor has released its draft Environment Plan (EP) for the proposed Stromlo-1 exploration drilling program in permit EPP 39 in the Great Australian ...

Norway >>  2/19/2019 - Faroe Petroleum Norge, operator of production licence PL 740, has concluded the drilling of appraisal wells 31/7-3 S and 31/7-3 A. The wells were dril...
Australia >>  2/18/2019 - Galilee Energy has provided an update on the upcoming drilling operations at its 100% owned and operated Glenaras multi-lateral pilot programme locate...

Mexico >>  2/13/2019 - Rowan Companies plc (RDC) announced that ExxonMobil has exercised the third of four options for the Rowan Relentless, an R-Class ultra-deepwater drill...
Botswana >>  2/12/2019 - Tlou Energy Limited, the ASX, AIM and BSE listed company focused on delivering power in Botswana and southern Africa through the development of coal b...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Russia Oil & Gas 1 >>  2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 |

Oil & Gas Projects in Russia >>

More News

Related Links

AZ BD BN CN GE HK ID IN IR JP KR KZ MM MN MY PG PH PK RU SG TH TJ TM TW UA UZ VN
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.