Weekly Drilling Report May 4, 2023
Source: www.gulfoilandgas.com 5/5/2023, Location: Europe
WELL: Bayhanli-2
Measured Depth: 2804 metres
Week Summary:
1. Condition 12 1/24 x 13 hole for 9 5/8 casing to 2804 metres measured depth.
2. RIH 9 5/8 casing to 2300 metres
Further Activities:
1. Continue to run in 9 5/8 casing to 2804 metres and cement casing
2. Drill 8 œ X 9 hole to 3400 metres, set 7 casing and cement
3. Perforate, test and turn over to production department
The measured total depth is about 3400 metres, with true vertical depth about 1200 metres. This well will take about another 10 days to drill at total depth.