Dril-Quip Announces Successful Installation of BigBore(TM) IIe Wellhead System for Petrobras

Source: www.gulfoilandgas.com 6/7/2023, Location: South America

Dril-Quip, Inc., announced the successful installation of its 18 3/4" BigBore™ IIe wellhead system for the Petrobras Exploratory project in the Aram Block of the Santos Basin, in 2002-meter water depth. The BigBore™ IIe wellhead system is the newest and most advanced standard system for Dril-Quip, with sealing technology qualified to the latest Petrobras standards. The 18 3/4" BigBore™ IIe system provides significant cost savings by eliminating the need for drilling or production lockdown devices, reducing the number of trips associated with drilling the well.

Don Underwood, Dril-Quip's Vice President of Subsea Products, stated, "We are pleased to have worked closely with Petrobras to qualify our 18 3/4" BigBore™ IIe wellhead system to their latest standards. This installation demonstrates Dril-Quip's ability to deliver reliable and efficient solutions worldwide to our customers. We are confident that our wellhead system will perform to the highest standards in this challenging application."

Jeff Bird, Dril-Quip's President and Chief Executive Officer, added, "The Petrobras Exploratory project in Brazil is crucial for the region. Dril-Quip's wellhead system will play a critical role in ensuring its success. Dril-Quip has a long-standing relationship with Petrobras, and this successful installation further strengthens our partnership and commitment to excellence."





Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.