The Petroleum Safety Authority Norway (PSA) has given Equinor consent to use AKOFS Seafarer for light well intervention and coiled tubing in the period 1 June 2023
to 15 June 2025 on the Norwegian Continental Shelf.
Operator: Equinor Energy AS
Fields:
Snøhvit, including Askeladd
Johan Castberg
Åsgard, including Smørbukk, Midgard, Morvin
Trestakk
Mikkel
Kristin, including Maria and Tyrihans
Tyrihans
Norne, including Alve, Urd and Skuld
Njord, including Hyme, Bauge and Fenja
Hyme
Bauge
Heidrun
Visund, including Visund Sør and Visund Nord
Troll
Fram, including Fram Nord and Byrding
Byrding
Oseberg, including Tune
Gullfaks
Snorre, including Toris and Vigdis
Tordis and Vigdis
Statfjord, including Statfjord Nord, Statfjord Øst and Sygna
Sleipner, including Sigyn and Utgard (production only)
Utgard
Johan Sverdrup
Svalin
Breidablikk
Martin Linge
Aasta Hansteen
Facility: AKOFS Seafarer
Other info: light well intervention is wireline-based well maintenance, whereby a cable is routed directly through the water and down into the well without the use of a riser.