Harbour Crane Maintenance
Source: www.gulfoilandgas.com 6/13/2023, Location: Asia
Mobile Harbour Crane (MHC) equipped Berth No.14 (erstwhile Berth No.13) will be operated with only one MHC (MHC No.2) tentatively from 13 to 22 June, as major maintenance work is scheduled to be done in MHC 3 during the aforesaid period.