Aker BP Receives Consent for the Use of Noble Invincible

Source: www.gulfoilandgas.com 9/20/2023, Location: Europe

The Norwegian Petroleum Safety Authority (PSA) has granted Aker BP consent for use of the mobile drilling facility Noble Invincible for permanent plugging of wells on Hod.

Operator: Aker BP

Field: Hod

Production license: 033

Facility: Noble Invincible

Hod
Hod is a field in the southern part of the Norwegian sector in the North Sea, about 13 kilometres south of the Valhall field. The water depth is 72 metres. Hod was discovered in 1974, and the plan for development and operation (PDO) was approved in 1988. Production started in 1990.

A PDO for the redevelopment of Hod was approved in December 2020. This involves installing a new wellhead platform tied-in to the Valhall field centre.


Malaysia >>  11/27/2023 - The Board of Directors of Velesto Energy Berhad ("VEB") is pleased to announce that Velesto Drilling Sdn. Bhd. (“VED”), a wholly-owned subsidiary of V...
United Kingdom >>  11/23/2023 - Reference is made to the Half-Year Report 2023 and the stock exchange release of 14 March 2023 from Awilco Drilling PLC (“Awilco Drilling”) regarding ...

Norway >>  11/22/2023 - The DNV-classed rig, Transocean Norge, has become the first semisubmersible rig to be awarded DNV’s Abate (Power+) notation following significant upgr...
Algeria >>  11/21/2023 - ADES Holding Company (“ADES”), a world leading oil and gas drilling services provider, announced its expansion into Southeast Asia with the award of ...

Norway >>  11/20/2023 - KCA Deutag has been awarded a contract to carry out a major project to electrify Equinor’s jackup rig, Askepott, in Norway.

The electrifica...

Norway >>  11/16/2023 - The Petroleum Safety Authority Norway (PSA) has given Equinor consent to use COSL Promoter for drilling two observation wells at the Statfjord satelli...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.