Salamander, a joint venture between Ørsted, Simply Blue Group and Subsea7, has successfully
launched floating LiDAR and wave buoys as part of the metocean campaign for the proposed
floating offshore wind farm project off the North East of Scotland.
The survey, conducted by Fugro, will run for 12 months and produce insights which will inform
the project's design, operations, and maintenance strategy, as well as support the planning
application process.
Two floating SEAWATCH® Wind Lidar Buoys and a Wavescan® buoy have been deployed to
gather essential meteorological, oceanographic, and environmental site data. These include wave
height, wind and current speed and other region-specific metrics, enabling a comprehensive
assessment of the site's characteristics and seasonal conditions.
The metocean survey forms part of a series of surveys to be conducted by Salamander before
starting the Environmental Impact Assessment (EIA) and Habitat Regulations Appraisal (HRA).
The project team aims to submit the necessary consent applications by early 2024.
Hugh Yendole, Project Development Director at Salamander said: “This is a key step in the
development of our pioneering project. As a stepping-stone development, Salamander will use
innovative floating offshore wind technologies to help Scotland and the UK progress towards a
net-zero future. This survey is crucial in determining the most appropriate course of action
moving forward.
“We are pleased to have Fugro on board for the delivery of the survey, to aid our understanding
of the environmental factors that will influence the selection of any design or operational
features of the farm.”
Salamander will be located 35 km off the coast of Peterhead, Scotland, and will generate enough
green energy to power 100,000 Scottish homes. It will also provide insight and best practices to
future commercial scale developments in Scottish waters, ahead of the larger-scale ScotWind
buildout.