Cuba Block 9: Alameda-3 Drilling Update
Source: www.gulfoilandgas.com 2/14/2024, Location: South America
Highlights
• Well at 2397mMD drilling 12-1/2” hole.
• Forward plan: drill to TD of 12-1/2” hole section (2869mMD).
• Once Section TD reached, set 9 5/8” casing.
• TD of well: 3835mMD.