Seismic survey News in Iran

Siemens to Resume Transformer Supply to Iran
5/9/2017 - Germany’s Siemens plans to resume providing power transformers to Iran, the commercial director of its licensed production company says, attributing the development to Iran’s nuclear deal with six wor...
GWL Announces 2D Seismic Survey in the Iranian Sector of the Caspian Sea
4/17/2017 - Geology Without Limits (GWL) in conjunction with Geological Survey of Iran (GSI) and Ministry of Mine, Industry and Trade (MMIT), plan to acquire 4 800 km of 2D seismic, gravity and magnetic data in t...
NIOC Awarded Tandis 3D Seismic Data Acquisition to Dana Energy
3/7/2016 - NIOC Exploration Directorate has awarded Tandis 3D seismic data acquisition to Dana Energy’s geophysical services through a tender process. Tandis project covers 1,400 square Kilometer area which is l...
Bibi Hakeemeh 3D Seismic Ends
7/6/2015 - Head of Geology Department at National Iranian South Oilfields Company said, the 3D seismic operation at Bibi Hakeemeh oilfield has come to an end. ...
Two 3-D Seismic Operations in South Region
6/1/2015 - An already made decision on conducting 3-D seismic operations in Tandis and Minoo will come into force this year, director of exploration at the National Iranian Oil Company (NIOC) Hormoz Ghalavand sa...
Bibi Hakeemeh 3D Seismic at 87% Headway
4/6/2015 - Head of Geology Department at National Iranian South Oilfields Company said, the 3D seismic operation at Bibi Hakeemeh oilfield has made 87% physical progress up to now. ...
Iran Says will Not Cut its Output as Part of OPEC Action
11/28/2014 - Iranian Oil Minister Bijan Namdar Zanganeh said, November 26, that Iran would not cut its oil production regardless of what OPEC ministers decide at a meeting on Thursday because output from the Islam...
3-D Seismic Operation Over in Lali and Karoun Oil Fields
10/7/2014 - The National Iranian South Oil Company (NISOC) has completed three dimension seismic operations in Karoun and Lali oil fields, NISOC’s deputy for geological operations Farokh Naseri Karimvand said. ...
3-D Seismic Operations in Ramin Oil Field Over
7/16/2014 - 3-d seismic operations ended in Ramin oil field successfully with the goal of acquiring enough knowledge about its structure as well as getting comprehensive information about its two oil layers Asmar...
ICOFC to Finish Khangiran Seismic Operation Next Year
11/13/2012 - Managing director of the Iranian Central Oil Fields Company said seismic operation of Khangiran phase 3 would be completed next year with the aim of determining accurate gas storage rate in the region...
ICOFC, DGC Signed Contract of Tang-E-Bijar
1/20/2010 - Iranian Central Oil Field Company and Dana Geophysics Company signed contract of Tang-e-Bijar complementary seismic project. Tang-e-Bijar 2D seismic project has been planned to be done in 12 months an...
Belorusneft Starts Seismic Exploration Oil Fields
10/18/2009 - Specialists of the Belarusian oil company Belorusneft have started seismic exploration of the Band-e-Karkheh field in southern Iran, the Belorusneft press service told BelTA. The seismic exploration i...
Seismc Survey at Caspian’s 4th Block Ahead of Schedule
10/31/2005 - Seismographic survey in the Caspian Sea’s 4th block is 13% ahead of schedule. The Pejvak Vessel has so far mapped 430 KM of seismic diagrams of the area in Iranian side, executive director of Oil Expl...

Formation Evaluation General Geological, Geophysical Geophysical Contractors Mud Logging Reservoir Engineering & Recovery Methods Seismic survey Well Completion, Logging, Workover
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.