7/5/2022 - With regard to its BM-C-33 project offshore Brazil, TechnipFMC (FTI) and Equinor Energy do Brazil Ltda., a division of Equinor ASA (Equinor), have signed a Letter of Intent for an integrated Front End... |
1/30/2020 - Equinor has, on behalf of the partners ExxonMobil and Petrogal Brasil entered into Front End Engineering and Design (FEED) contracts with early commitments and pre-investments for phase 1 of the Bacal... |
1/30/2020 - Subsea 7 S.A. announced the award to Subsea Integration Alliance(1) of an exclusive contract by Equinor for the Front End Engineering Design (FEED) study on its Bacalhau (formerly Carcara) project, of... |
4/30/2015 - A Brazilian oil company has selected Nexans for a FEED (Front End Engineering & Design) contract to deliver a complete Direct Electrical Heating (DEH) system for the subsea pipelines serving an offsho... |
8/23/2012 - Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group has been awarded a contract by Petroleo Brasileiro S.A. (Petrobras) for a world-scale grassroots gas-to-c... |
12/13/2010 - Foster Wheeler AG announced that its Global Engineering and Construction Group has been awarded a basic engineering design and front-end engineering design (FEED) contract for two grassroots refinerie... |