3/17/2023 - JGC Holdings Corporation (Representative Director, Chairman and CEO Masayuki Sato) announced that JGC Corporation (Representative Director and President Farhan Mujib) which operates the overseas engin... |
3/7/2023 - Santos announced the Papua LNG joint venture has launched fully-integrated front-end engineering and design (FEED) for the Papua LNG project in Papua New Guinea. Papua LNG is expected to hav... |
3/7/2023 - TotalEnergies, operator of the project, announces the launch of the fully integrated Front-End Engineering and Design (FEED) for the Papua LNG project. Following pre-FEED studies, in order t... |
8/22/2022 - Technip Energies (TE), leader of a consortium with Clough, has been selected to perform the Front End Engineering Design (FEED) for TotalEnergies’ Papua LNG project’s upstream production facilities in... |
7/20/2022 - TotalEnergies, as operator, has announced the decision of the Papua LNG joint venture to launch the first phase of front-end engineering and design (FEED) studies for the Papua LNG project's upstream... |
4/19/2021 - Ahead of a targeted signing date on the 20th April 2021, the PNG Government has again increased its demands from the Pasca A Gas Agreement. The Government informed Twinza on 16th April 2021 that it no... |
4/9/2019 - Total and its partners ExxonMobil and Oil Search have signed the Gas Agreement with the Independent State of Papua New Guinea defining the fiscal framework for the Papua LNG Project. This Gas Agreemen... |