Gulf Oil and Gas accountACCOUNT

Drilling News

XTRACT Updates Drilling Operations in Turkey
Turkey >> 3/22/2010 - Xtract Energy Plc is pleased to provide the following update on the drilling operations of its Turkish business, Extrem Energy AS ("Extrem Energy") in the Alasehir licence area. ...
Anadarko Reaches Total Depth in Windjammer Well
Mozambique >> 3/22/2010 - Anadarko reached total depth of approximately 16,930 feet in the Windjammer discovery well and encountered an additional 76 net feet of natural gas pay. The additional pay intersected in the deeper ob...
Oil Search Updates Al Meashar-1, Block 7, Yemen
Yemen >> 3/18/2010 - Oil Search reports that the Al Meashar-1 well in Block 7, Yemen was at a Total Depth (TD) of 3,660 metres and running in hole with testing equipment. During the week, the well was drilled to TD, loggi...
Maurel & Prom Provides Update on Mafia Drilling
Tanzania >> 3/17/2010 - Mafia Deep drilling began 4 August 2008. The initial target depth was 4,600 m. While drilling was underway, interpretation of well data led to the reinterpretation of the seismic data and the target w...
Gazprom Commenced Drilling of 1st Well in Africa
Algeria >> 3/15/2010 - In compliance with its obligations under the contract with the Algerian National Agency for the Valorization of Hydrocarbon Resources (ALNAFT), the Gazprom Group has commenced drilling of the first pr...
Oil Search Provides Drilling Update on Wasuma 1
Papua-New Guinea >> 3/11/2010 - Oil Search reports that during the week the PPL 219 participants decided to drill a sidetrack on the Wasuma 1 well due to mechanical issues. The Wasuma-1 ST1 well was at a depth of 2,850 metres. The f...
VAALCO Provides Update on Gabon Drilling Program
Gabon >> 3/10/2010 - VAALCO Energy, Inc. is pleased to announce that the contracted rig “Sapphire Driller” is on location at the Ebouri Platform offshore Gabon and will commence drilling the first of four wells today, Mar...
Transocean KG2 Begins Five-Year Contract in India
India >> 3/8/2010 - Transocean Ltd. announced that the new build ultra-deepwater drillship Dhirubhai Deepwater KG2, which is owned by a joint venture with Pacific Drilling Limited, has commenced operations for Reliance I...
Max to Commence Exploration Drilling in Block E
Kazakhstan >> 3/8/2010 - Max Petroleum Plc an oil and gas exploration and development company focused on Kazakhstan, is pleased to announce that it has commenced drilling the KZN-1 exploration well on the North Kyzylzhar II E...
Beach Updates Drilling Operations on N.Shadwan
Egypt >> 3/3/2010 - Beach Energy announced operations update on North Shadwan Concession - Gulf of Suez, Egypt. The Nafta-1 rig has been released from the NS377-5 oil field development well location. ...
XTRACT Energy Provides Drilling update in Turkey
Turkey >> 3/2/2010 - Xtract Energy Plc is pleased to provide further details about the proposed exploration well to be drilled by its joint venture company Extrem Energy AS ("Extrem") on the Siraseki licence area in Turke...
OGX Finishes Drilling of the Well 1-MRK-2B-SPS
Brazil >> 3/2/2010 - OGX announces the conclusion of drilling of the well 1-MRK-2B-SPS, located in the BM-S-29 block, in the shallow waters of the Santos basin. The block is part of a concession in which OGX holds a 65% w...
Turkish TPIC Wins $318 m Iraq Oil Contract
Iraq >> 3/1/2010 - TPIC, the foreign exploration unit of state-run Turkish Petroleum, has won a $318 million contract to drill 45 wells in Iraq's supergiant Rumaila oilfield, a senior Iraqi oil official said. ...
M&P Announced Successful OMOC-N-1 Well in Gabon
Gabon >> 3/1/2010 - Maurel & Prom announced successful OMOC-N-1 well in Gabon. Maurel & Prom (85%) operates the Onal production licence and is partnered by Tullow (7.5%) and AIC-Petrofi (7.5%). ...
M&P to Update La Noumbi Exploration Licence
Congo >> 3/1/2010 - Maurel & Prom annonced an exploration update in Congo.The Tie-Tie-NE-1 well has reached a final depth of 2,550 m in the Djeno formation (Lower Cretaceous). Between 1,775 and 1,875 metres, a siltstone ...
Aramco Awards Baker Hughes Contract for Tubing
Saudi Arabia >> 2/25/2010 - Saudi Aramco has awarded Baker Hughes a two-year contract for two fit-for-purpose underbalanced coiled tubing drilling packages designed to re-enter existing wells in the gas fields of southern Saudi ...
Dana Provides Drilling Program in West El Burullus
Egypt >> 2/25/2010 - Dana is pleased to provide an update on its exploration drilling programme and forward plans for the coming months. The Company spudded the Bamboo well (Dana 50%) in the West El Burullus concession, ...
Kenya Says CNOOC Well Has Not Struck Oil Yet
Kenya >> 2/24/2010 - China's CNOOC has drilled 4,456 metres of its Boghal-1 well in Kenya's Block 9 and has not made any discovery yet, the National Oil Corporation of Kenya said. ...
OGX Concludes Drilling of Well OGX-5
Brazil >> 2/22/2010 - OGX has completed the drilling of well 1-OGX-5-RJS, located in block BM-C-43, in the shallow waters of the southern part of the Campos Basin. OGX holds a 100% working interest in this block. ...
Far East Achieved Progress in Its Drilling Program
China >> 2/18/2010 - Far East Energy Corporation announced it has achieved significant progress in its winter drilling program, designed to increase gas production from its Shouyang 1H Pilot Area in anticipation of gas sa...

Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.