Gulf Oil and Gas accountACCOUNT

Drilling News

Oracle Commences Drilling on Fatima Prospect, Yemen
Yemen >> 10/12/2006 - Oracle Energy Corp. has been notified by project operator Yemen Mayfair Petroleum Corp. (YMPC) that the Fatima -1 well, Block 22, Yemen was spudded October 12, 2006. The well is planned to a total dep...
NIDC’s Drilling Operations at Around 20,000 Meters
Iran >> 10/11/2006 - The National Iranian Drilling Company (NIDC) has carried out 19,834 meters of drilling operations on 35 oil and gas wells in the first half of the current Iranian year (started March 21, 2006), the he...
TG World Energy Provides Ténéré (Niger) Project Update
Niger >> 10/10/2006 - TG World Energy Corp. announced that mobilization is continuing successfully toward drilling of the Saha-1 Exploration Well in the Ténéré Block, Niger, despite the extraordinary weather events and log...
Hardman Provide Mauritania Drilling Update
Mauritania >> 10/9/2006 - Hardman Resources Limited announced that on 7 October 2006, the Atwood Hunter commenced drilling the Dana-operated Aigrette-1 exploration well in Block 7 offshore Mauritania, West Africa. As at 6:00am...
Hyperdynamics Takes Step Toward Drilling Offshore Guinea
Guinea >> 10/5/2006 - Hyperdynamics has contracted with Applied Drilling Technology, Inc. ("ADTI"), a wholly owned subsidiary of GlobalSantaFe, to provide a detailed assessment of drilling infrastructure, support services ...
TransGlobe Energy Provides Yemen Operational Updates
Yemen >> 10/4/2006 - TransGlobe Energy Corporation announced a successful Qishn oil well at Godah #3, Block 32 in Yemen (13.81% working interest)and other operational updates.

Drilling operations: The Go...
FirstAfrica Provides Gabon Operations Update
Gabon >> 10/4/2006 - FirstAfrica completed its production drilling of four wells in early September and anticipates initial production of in excess of 7,000 bopd commencing in 3Q 2007 following installation of the product...
Equator Provides Bilabri Field Development Update
Nigeria >> 10/3/2006 - Equator and Peak said that as previously reported the Bilabri D2 well encountered an 8 metre column of oil in the C2 sands of the reservoir. The C2 oil is of excellent quality with an oil gravity of 3...
Maurel & Prom Provides Congo (Brazzaville) Drilling Update
Congo >> 10/2/2006 - Maurel & Prom announced that the Well 706 located in the center of the M'Boundi oilfield was tested with a 40/64" choke at 3 500 b/d. This result reveals a potential for a number of infill wells to be...
NIDC finishes drilling 5 oil and gas wells ahead of schedule
Iran >> 10/1/2006 - The National Iranian Drilling Company (NIDC) has succeeded in drilling, repairing and development of five oil and gas wells in Naftshahr, Qaleh Nar, Darkhowein and Kangan located in the oil and gas-ri...
Hardman Provides Mauritania Drilling Update
Mauritania >> 9/26/2006 - Hardman Resources Limited that Since the company’s last report on 19 September 2006, the Atwood Hunter has drilled the Flamant-1exploration well to a total depth of 3,299 meters and completed wireline...
Dana Petroleum Complete Drilling on Flamant-1 Well Offshore Mauritania
Mauritania >> 9/26/2006 - Drilling and wireline logging have now been completed on the Flamant-1 exploration well in Block 8, offshore Mauritania. Although the well discovered the prognosed extensive carbonate section, the wel...
Fatima Prospect, Block 22, Yemen to be drilled Mid-October
Yemen >> 9/20/2006 - Oracle Energy Corp. has been notified by project operator Yemen Mayfair Petroleum Corp. (YMPC) that preparations are actively underway to drill the Fatima-1 well on the Fatima prospect, Block 22, Yeme...
Hardman Provides Mauritania Exploration Drilling Update
Mauritania >> 9/19/2006 - Hardman Resources Limited Announced Since last report on 12 September 2006, the Atwood Hunter has drilled the Flamant-1exploration well to a depth of 3,299 meters. Current operations are preparing for...
DNO Provides Yemen Drilling Update
Yemen >> 9/18/2006 - Production operations
As a result of a security incident on the Ash Shihr Terminal on Friday 15th September the terminal was shutdown on a temporary and precautionary basis. As a result...
DNO Provides Iraq Drilling Update
Iraq >> 9/18/2006 - Tawke operations
Following the testing of the discovery well Tawke # 1 in June 2006 a twin well, Tawke # 1A, was drilled at a location some 20 meters from the discovery well. The main o...
Japan government to enter into Iran oil drilling talks
Iran >> 9/13/2006 - Japan's government said it will enter into talks to drill for oil in Iran days before a deadline to reach an agreement on the $2.5 billion Azadegan project sought by Japan's Inpex Holdings Inc.
Hardman Provides Mauritania Drilling Update
Mauritania >> 9/12/2006 - Hardman Resources Limited announced Since the last report on 5th September, the ‘Atwood Hunter’ has drilled the Flamant-1 exploration well to a depth of 2,035 meters where the 13 3/8” casing has been ...
Gulfsands Commences Drilling Tigris-1 Well Within Block 26, Syria
Syria >> 9/11/2006 - Gulfsands Petroleum plc has commenced drilling the Tigris-1 well within Block 26, Syria. The Tigris-1 represents the first of a series of wells proposed to be drilled by the Company in Block 26 over t...
Drilling Report for Growler-1, PEL 104, Cooper Basin, South Australia
Australia >> 9/8/2006 - Victoria Petroleum N.L. as Operator for the PEL 104 Joint Venture advises that the current operation at 0600 hrs Central Standard Time after completing the setting of the 9 5/8 inch casing at 589 metr...

Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.