Gulf Oil and Gas accountACCOUNT

Drilling News

DNO Provides Iraq Drilling Update
Iraq >> 9/18/2006 - Tawke operations
Following the testing of the discovery well Tawke # 1 in June 2006 a twin well, Tawke # 1A, was drilled at a location some 20 meters from the discovery well. The main o...
Japan government to enter into Iran oil drilling talks
Iran >> 9/13/2006 - Japan's government said it will enter into talks to drill for oil in Iran days before a deadline to reach an agreement on the $2.5 billion Azadegan project sought by Japan's Inpex Holdings Inc.
Hardman Provides Mauritania Drilling Update
Mauritania >> 9/12/2006 - Hardman Resources Limited announced Since the last report on 5th September, the ‘Atwood Hunter’ has drilled the Flamant-1 exploration well to a depth of 2,035 meters where the 13 3/8” casing has been ...
Gulfsands Commences Drilling Tigris-1 Well Within Block 26, Syria
Syria >> 9/11/2006 - Gulfsands Petroleum plc has commenced drilling the Tigris-1 well within Block 26, Syria. The Tigris-1 represents the first of a series of wells proposed to be drilled by the Company in Block 26 over t...
Artumas Announces Mnazi Bay-2 Well Nearing TD
Tanzania >> 9/8/2006 - The Mnazi Bay #2 (MB-2) well is currently drilling through the Miocene/Oligocene formations of the Tertiary period at a depth of approximately 6000 feet. Total depth (TD) of MB-2 is expected to be 667...
Drilling Report for Growler-1, PEL 104, Cooper Basin, South Australia
Australia >> 9/8/2006 - Victoria Petroleum N.L. as Operator for the PEL 104 Joint Venture advises that the current operation at 0600 hrs Central Standard Time after completing the setting of the 9 5/8 inch casing at 589 metr...
Drilling Report for Primero-1, Reids Dome, PL 231, Bowen Basin, Central Queensland
Australia >> 9/6/2006 - Encouraging results in the initial stages of Primero-1 have led WSP to begin a thorough review of all existing data available from other wells previously drilled into the Cattle Creek Formation at Rei...
Drilling Report for Growler-1, PEL 104, South Australia
Australia >> 9/6/2006 - Victoria Petroleum N.L. as operator for the PEL 104 Joint Venture advises that the current operation at 0600 hrs Central Standard Time is waiting on cement to set after having set 95/8 inch casing at ...
Drilling Report for Growler-1, PEL 104, South Australia
Australia >> 9/5/2006 - Victoria Petroleum N.L. as Operator for the PEL 104 Joint Venture advises that the current operation at 0600 hrs Central Standard Time is preparing to run 9 5/8 inch casing after having drilled to 612...
Encouraging wireline log results from Jingemia-8 oil development well
Australia >> 9/5/2006 - Victoria Petroleum NL has been advised today by the operator, Origin Energy Limited of the following wire line log results for the oil appraisal/development well Jingemia-8, located in the onshore Per...
Hardman Provides Mauritania Drilling Update
Mauritania >> 9/5/2006 - Hardman Resources announced Since the last report on the Flamant-1 exploration well, repairs have been made to the Blow Out Preventer (BOP) and it has been re-run to the seabed. As at midnight on 4 Se...
Oil Drilling to Start in Uganda by 2010
Uganda >> 9/5/2006 - Uganda is expected commence oil drilling by 2010 following the recent impressive exploration results by Australian-based Hardman Resources Ltd., Minister for Energy and Minerals Development Daudi Mige...
Angola, Venezuela Sign Oil Agreement As Chavez Visit Ends
Angola >> 9/1/2006 - Oil ministers from Angola and Venezuela signed an oil agreement on exchanging technology and experience in drilling and management, an Angolan official said. The agreement, which also mentioned refine...
Drilling Report for Jingemia-8 Oil Appraisal/Development Well, Western Australia
Australia >> 9/1/2006 - Victoria Petroleum NL has been advised today by the operator, Origin Energy Limited that the oil appraisal/development well Jingemia-8, located in the onshore Perth Basin Production Licence L14, was a...
DNO Provides Yemen Drilling Update
Yemen >> 8/31/2006 - Tasour #22 ST
The Tasour #22 ST development well was drilled to a total depth of 1,853 meters and completed as a producing Qishn oil well. The well encountered oil bearing upper Qishn s...
Tethys Oil Provides OMAN Operational Update
Oman >> 8/31/2006 - Tethys Oil announced that the work on Block 15 is progressing well. The consortium consisting of Tethys wholly owned subsidiary GotOil Resources (Oman) Limited as Operator with 40 per cent interest an...
IPR drilling campaign Nets Results in the Western Desert of Egypt
Egypt >> 8/30/2006 - IPR, a Texas Independent, has continued to make significant strides in the North Bahariya Concession in the Western Desert of Egypt. Norpetco, the operating Company for IPR and its two partners Sipetr...
Hardman Provides Mauritania Drilling Update - FLAMANT-1
Mauritania >> 8/29/2006 - Since the last report, drilling of the Flamant-1 exploration well in Block 8 remains at its previously reported depth of 1,867 metres due to stormy weather conditions and mechanical difficulties resul...
Drilling Report for Jingemia-8 Oil Appraisal/ Development Well, Western Australia
Australia >> 8/27/2006 - Victoria Petroleum NL has been advised today by the operator, Origin Energy Limited that the oil appraisal/development well Jingemia-8, located in the onshore Perth Basin Production Licence L14, was a...
DNO Provides Nabrajah-11 Update
Yemen >> 8/24/2006 - The testing of well Nabrajah-11 is now completed and the well is being temporarily suspended. A maximum oil rate of 650 bopd was obtained during the test. Due to restricted inflow performance this oil...

Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.