9/1/2009 - Victoria Petroleum N.L. as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-2 has resulted in a flow to the surface from the Birkhead Formation of clean 4... |
7/27/2009 - Victoria Petroleum N.L. (Vicpet) as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-1 has resulted in a flow to the surface from the Birkhead Formation o... |
3/16/2006 - Victoria Petroleum N.L. has been advised by the operator Oilex N.L that the Donga-3 well has been successfully completed, pumping equipment installed and a long term production test commenced. The wel... |