Testing News in Australia

Snatcher-2 Flows 207 bobd on Short Term Production Test
9/1/2009 - Victoria Petroleum N.L. as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-2 has resulted in a flow to the surface from the Birkhead Formation of clean 4...
Snatcher-1 Flows 218 Barrels of Oil per Day
7/27/2009 - Victoria Petroleum N.L. (Vicpet) as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-1 has resulted in a flow to the surface from the Birkhead Formation o...
Oilex Completes Donga-3 Well as Oil Producer
3/16/2006 - Victoria Petroleum N.L. has been advised by the operator Oilex N.L that the Donga-3 well has been successfully completed, pumping equipment installed and a long term production test commenced. The wel...

General Hydrostatic Testing Inspection Laboratory Services Non Destructive Testing Testing
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.