3/18/2024 - CNOOC Limited (SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that the Company has made a major oilfield discovery of Qinhuangdao 27-3 in Bohai Sea, which adds over a hundre... |
3/14/2024 - China Petroleum & Chemical Corporation (HKG: 0386, "Sinopec") has announced that the West Sichuan Gas Field, Sinopec's third 100-billion-cubic-meter submarine natural gas field in the Sichuan basin, h... |
2/26/2024 - Since January, the Bohai Oilfield, my country's largest crude oil production base, has anchored its goals, consolidated its responsibilities, and unswervingly fought the battle to increase reserves an... |
1/19/2024 - Shengli Oilfield’s crude oil production in 2023 was 23.45 million tons appeared on the China Central Radio and Television Station’s “News Network” and attracted widespread attention. Xinhua Finance, C... |
1/12/2024 - The National Energy Administration released the top ten landmark results of national oil and gas exploration and development in 2023. The top t... |
1/11/2024 - The reporter learned from the Sinopec Information Office that Sinopec’s key pre-exploration well in Liangping District, Chongqing, Well Xingye 9, had tested a high-yield shale oil and gas flow, with a... |
1/3/2024 - CNOOC Limited (the “Company”, (RMB Counter), SSE: 600938) announces that Lufeng Oilfields Phase II Development Project has commenced
production. ... |
12/26/2023 - The commercial natural gas volume in the Sichuan-Chongqing transfer block of Daqing Oilfield has increased by more than 40% year-on-year this year, outpacing the
"acceleration" of production in Sich... |
12/25/2023 - The Wenxi No. 1 gas storage of the Wenjisang gas storage group in the Tuha Oilfield officially started to produce gas, adding gas to surrounding cities this winter and next spring. Warm "confidence". ... |
12/21/2023 - Daqing Oilfield Zhaoshen 19-Ping 3 Well was successfully put into production, with a daily gas increase of 210,000 cubic meters. As a result, all three new high-yield gas wells in Zhaoshen Block 19 ha... |
12/21/2023 - The CCUS pilot test of the Dual 229 Block in Liaohe Oilfield has completed the injection work of 22 gas injection wells, injecting 78,000 tons of carbon dioxide in stages, completing 95% of the annual... |
12/19/2023 - The Tarim Oilfield has transported more than 6 billion cubic meters of natural gas to the five prefectures in southern Xinjiang this year, a year-on-year increase of 1.31
billion cubic meters. |
12/19/2023 - In response to the continued extreme low temperatures caused by the strong cold wave weather, the Liaohe Oilfield gas storage group started the extreme supply guarantee mode, and the daily "peak" gas ... |
11/15/2023 - China’s largest ultra-deep oil and gas production base, Tarim Oilfield, has produced a cumulative oil and gas equivalent of more than 500 million tons in the past 34 years, including 161.37 million to... |
11/15/2023 - The cumulative gas production of the Liaohe Oilfield gas storage group exceeded 10 billion cubic meters, setting a new record to demonstrate Liaohe's responsibility
for ensuring energy supply. |
11/14/2023 - Daqing Oilfield’s first carbon dioxide injection technology low-yield and low-efficiency block overall treatment test area completed on-site construction of all 17 oil wells, and is expected to achiev... |
11/14/2023 - CNOOC Limited (the “Company”, SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Bozhong 19-6 Condensate Gas Field Phase I Development Project has
commenced production. ... |
10/27/2023 - CNOOC Limited (SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Penglai 19-3 Oilfield Area 5/10 Development Project has commenced
production. ... |
10/26/2023 - CNOOC Limited (SEHK: 00883 (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announces that Enping 18-6 Oilfield Development Project
has commenced production. The projec... |
10/24/2023 - CNOOC Limited (HKD Counter) and 80883 (RMB Counter), SSE: 600938) announced its operating results for the third quarter of 2023. In the first three quarters of the year, the Company continued to step ... |