Workover & Well Services News

Subsea Workover System Award to Aker Solutions
Norway >> 2/11/2011 - Aker Solutions has been awarded a letter of intent (LOI) from Statoil for the engineering, procurement and construction of a subsea workover system for the Vigdis North East development on the Norwegi...
Ramba Energy Strikes Oil in Jatirarangon Gas Field
Indonesia >> 2/9/2011 - SGX mainboard-listed company, Ramba Energy Limited (Ramba) announces the discovery of oil during the JRR-3 ST workover at the Jatirarangon gas producing field (Jati Block) in Cikarang, West Java, Indo...
Orca Exploration Announces Well Workovers
Tanzania >> 12/29/2010 - Orca Exploration Group Inc. has announced that it will perform workovers in 2011 on two Songo Songo offshore natural gas wells (SS-5 and SS-9). ...
Desire Provides Update 14/15-1Z Sidetrack Well
Falkland Islands >> 11/1/2010 - Desire Petroleum plc, the oil and gas company wholly focussed on the North Falkland Basin, provided an operational update on the 14/15-1Z sidetrack well on the Rachel prospect. ...
ExxonMobil Awards Contract to Halliburton
Iraq >> 10/14/2010 - Halliburton has been awarded a wellwork integrated services contract by ExxonMobil Iraq Ltd. for refurbishment of wells in the West Qurna (Phase 1) field in southern Iraq. ...
Expro Wins Integrated Contract in Algeria
Algeria >> 10/14/2010 - Leading global oilfield service company Expro has been awarded a multi-disciplinary contract in Algeria, by Petroceltic International plc. ...
Candax Commences Work-over Program at Ezzaouia
Tunisia >> 6/14/2010 - Candax Energy Inc is pleased to announce the start of the two well side-track program on the Maretap-operated Ezzaouia field, following a successful final inspection of the Ulysse rig and the commence...
Candax Provides Operations Update in Tunisia
Tunisia >> 4/22/2010 - Candax Energy Inc reports that the work-over intended to reconnect the parted tubing on the El Bibane 3 (EBB-3) well has been completed. The work-over commenced on March 19 and the jack-up barge was r...
Al Meashar-1 Flowed Unstabilised Oil Rates
Yemen >> 3/23/2010 - Oil Search reports that an open hole drill stem test over the interval 3,125 to 3,660 metres measured depth in the Al Meashar-1 well in Block 7, Yemen, commenced on March 18. The well has flowed oil a...
Gas2Grid Starts Malolos-1 Workover Program SC 44
Philippines >> 3/16/2010 - The Company is pleased to provide the following update on the Malolos-1 workover being conducted in Service Contract 44, onshore Cebu Island, Philippines in which it has a 100% interest: ...
Regal’s H1 Activity Updates Workover in Egypt
Egypt >> 9/17/2009 - Regal Petroleum plc (RPT) London based oil and gas exploration and production group, announces its unaudited results for the six months ended 30 June 2009. Work has been underway on a workover of the ...
Major North Sea Contract Win for Expro
United Kingdom >> 9/9/2009 - International oilfield service company Expro has been awarded a multi-million pound contract by Apache North Sea Ltd in the UK North Sea following completion of a competitive tender process. ...
Competent Person’s Report on Block MLHP-7 IF
Cameroon >> 6/1/2009 - Bowleven plc, the African focused oil and gas company listed on AIM, is pleased to announce the results of an independent study on the recent IF oil discovery on Block MLHP-7 of the Etinde Permit in t...
Boots & Coots Signs New Contract in Algeria Worth $ 28 Million
Algeria >> 8/4/2008 - Boots & Coots International Well Control announced it has signed a three year contract, with an option for two additional years, under an international call for tender launched by Algeria’s national o...
Sonoran Energy and AGR Sign Strategic Cooperation Agreement
Jordan >> 12/8/2005 - Sonoran Energy, Inc. has signed a Strategic Cooperation Agreement with AGR. Under the Agreement, AGR will invest $3 Million into Sonoran Energy, provide technical support and resources, and pursue joi...
Tanganyika Provides Egypt and Syria Development Update
Egypt >> 10/13/2005 - Tanganyika Oil Company Ltd. provided an update on its operations in Egypt and Syria. In Egypt, the Company now has five oil fields in production or under development -- Hana, Hoshia, West Hoshia, Fadl...
Lundin Provides an update on AJE-3 Appraisal Well in Nigeria
Nigeria >> 10/3/2005 - Lundin Petroleum AB announced that the appraisal well Aje-3 has reached its target depth at 8482 feet (2,600 meters). The well reached its reservoir objectives as anticipated and a detailed logging pr...
Tanganyika Reports Oudeh Field Update, Syria
Syria >> 1/26/2005 - January 25, 2005 . Tanganyika Oil Company announced that OD#138, the third of the horizontal wells drilled from the satellite production facility 6-well drilling pad, has been successfully acidized an...
Vintage Petroleum Announces Another Successful Well in Yemen
Yemen >> 9/20/2004 - Tulsa, Oklahoma – Vintage Petroleum, Inc. announced today that the An Nagyah #10 well in the Republic of Yemen has tested light (42 degree API) oil from the sub-salt Upper Lam formation. The well, a...
Tanganyika Oil Company reports 2004 Work Program for Egypt
Egypt >> 2/11/2004 - Tanganyika is pleased to announce its scheduled work program for the West Gharib Block in Egypt.

The West Gharib Block in Egypt is a 1,898 square kilometre concession flanking the Gulf of S...

Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.