Crude Oil Supply Line Replacement

Oil and Gas Pipeline
Reference RFP - 2322
Date 4/17/2011
Location Middle East
Scope
Replace the supply line of current crude oil 16-inch diameter connecting between the center of the main assembly in abundance to the manifold Burgan TB-1.

Bidding Information

Bid Bond KD 100,000.00
Documents Price KD 2,000.00
Oil and Gas Pipeline