Scope |
Contractor shall carry out the Engineering, Procurement, Installation, Construction, Pre-Commissioning, Commissioning and Testing to upgrade the F&G Systems at two GDS Stations; namely Station Wakrah and Station W-2/W-3. Station Wakrah is a GDS station at Wakrah that receives gas from offshore field and presently has an obsolete modular based F &G system (Sieger make). Station W-2/W-3 is a GDS station at Ras Abu Fontas that supplies gas to QEWC power stations RAF-B, RAF-B1 and RAF-B2 and presently has an obsolete modular based F&G system (ICS make). |