Reference | MTC-19 /2011 |
Date | 12/8/2011 |
Location | Africa |
Scope | Replacement of 16 inch recovery oil line between ballast & metering area at Tobruk Terminal. |
Bid Bond | 0.5% from bid total price |
Bond Validity | six months |
Documents Price | LD 1000 |