Replacement of 30" ONSAG Pipeline

Oil and Gas Pipeline
Reference GT12112100
Date 9/16/2012
Location Middle East
Scope
The scope of work covers the FEED for the replacement of the existing 30-Inch ONSAG Pipeline from Station B to Station S, which in summary entails the:
1). Provision of a new pipeline with the associated block valve stations, pigging, flow metering, telecommunication, power and other required facilities.
2). Provision of leak detection, corrosion protection, fire/gas detection and fire protection systems.
3). Provision of all operating, control and safeguarding systems required for the optimal and safe operation of the new pipeline.
4). Decommissioning, demolition and writing off the replaced section of the existing 30-Inch ONSAG pipeline.

Bidding Information

Bid Bond QAR 200,000.00
Bond Validity 150 days
Offer Validity 120 days
Documents Price QAR 500.00
Oil and Gas Pipeline
Related Prooducts: Oil and Gas Pipeline General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Railways Tank Truck Tankers
Related Tenders: General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Tank Truck Tankers

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.