Gulf Oil and Gas accountACCOUNT
Excavation & Laying 2 Inter-Trip Cables
Cables
Reference STC/OPN/881/11
Date 9/15/2011
Location Middle East
Scope Contractor shall be responsible to carry out all civil works such as manually excavate a shallow cable trench (300 mm depth x 300 mm width x 1,650 meter long), re-instate (backfill) the shallow cable trench accordingly for two (2) identified locations and lay two (2) new cables supplied by the company (6C x 6 mmsq XLPE/PVC/SWA/PVC) in the shallow underground cable trench for both locations.

Excavation and laying 2 inter-trip cables.

Bidding Information

Documents Price QR. 150
Cables
Related Prooducts: Cables Accumulators and Storage batteries Ammeters, Voltmeters, ect. Batteries Cable Trays Cables Cathodic Protection Circuit Breakers Contactors Control Panels Earthing materials Electric fittings & junction box Frequency Inverter General Lighting Panel Components Starter Steel Panels Switches Transformers Umbilical Lines UPS
Related Tenders: Accumulators and Storage batteries Batteries Cable Trays Cables Cathodic Protection Circuit Breakers Contactors Control Panels Earthing materials Electric fittings & junction box Frequency Inverter General Lighting Panel Components Starter Switches Transformers Umbilical Lines UPS

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Gulf Oil and Gas
Copyright © Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.