Reference | LT17105900 |
Date | 10/1/2017 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for FEED For Groundwater Drainage System in Mesaieed. The FEED design study shall provide the design of the recommended feasibility design solution for goundwater drainage system in Mesaieed. This will consist of a system of collection drains, pumping stations and pressure mains to enable the collection of groundwater across Mesaieed and dispose of it to an outfall channel. Due to the critical nature of the works the FEED design shall be split into 2 Phases/Milestones. Phase 1 shall be for the FEED design of the Mesaieed community areas drainage system and outfall. Phase 2 shall be for the FEED design of the Mesaieed secure area drainage and outfall system. As part of the Study scope it will also be required to evaluate the existing TSE flow monitoring system in Mesaieed and design upgrades to the system to improve the collection of flow and pressure data to allow to assess the current distribution of TSE. |
Bid Bond | QR 175,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 200.00 |