Reference | LT19100400 |
Date | 1/7/2019 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for FEED for Replacement of Refinery Pipeline Culverts in MIC. The scope of requirement of the project is summarized as below: Design of New Refinery Pipeline Culverts 8 no new RCC culverts to replace the existing Pipeline Culverts shall be designed according to the changed site & loading conditions, applicable local and international codes/ standards and QP/ Shell DEPs. Topographic and geotechnical investigation will be required at these locations. Alignment of culverts will remain the same. Particular attention shall be given in the design to prevent ground water ingress into the culverts. As the pipe lines services cannot be disrupted, design of the new culverts shall be undertaken with this criteria. Specific design shall also be undertaken for the demolition works associated with the existing 8 No culverts that require to be replaced. |
Bid Bond | QR 40,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 200.00 |