El-Feel 30” P/L Transmission System Upgrade & Enhancement

Oil and Gas Pipeline
Reference 956
Date 2/6/2020
Location Africa
Scope
The company announces its need to revamp and upgrade the existing Fibre Optic(FOC) backbone in interconnecting between NC -174 and NC-115 for the distance of 72 KM, and the other FOC between NC -115 covers a distance about 725 km along the 30” pipeline to Mellitah Complex.

The existing network is constructed of 29 nodes using SDH technology STM – 4 (1662 SMC) nods in 20 sites ,while the remaining 9 sites are linked through the Alcatel 1521FL-IP optical line terminals Provided with optical and Ethernet interfaces. In all sites SCADA and phone traffic is connected and transferred towards the main control site NC -174.

Bidding Information

Oil and Gas Pipeline
Related Prooducts: Oil and Gas Pipeline General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Railways Tank Truck Tankers
Related Tenders: General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Tank Truck Tankers

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.