Gulf Oil and Gas accountACCOUNT
Provision of National Grid Power Utilization Upgrade
Cables
Reference 013/SC/20
Date 4/19/2020
Location Middle East
Scope
The company announces its need for Provision of National Grid Power Utilization Upgrade.

Contractor’s Scope of Work includes but not limited to the major maintenance for the following items, for details, refer to attached scope of work.
- Install switch gear
- Install and move the cable
- The modification shall be completed within 180 days after the contract signed (or letter of award) and the commencement of works issued whichever is the latest.

Bidding Information

Bid Bond US 4,000.00
Documents Price US 100.00
Cables
Related Prooducts: Cables Accumulators and Storage batteries Ammeters, Voltmeters, ect. Batteries Cable Trays Cables Cathodic Protection Circuit Breakers Contactors Control Panels Earthing materials Electric fittings & junction box Frequency Inverter General Lighting Panel Components Starter Steel Panels Switches Transformers Umbilical Lines UPS
Related Tenders: Accumulators and Storage batteries Batteries Cable Trays Cables Cathodic Protection Circuit Breakers Contactors Control Panels Earthing materials Electric fittings & junction box Frequency Inverter General Lighting Panel Components Starter Switches Transformers Umbilical Lines UPS

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.