Reference | 1233/2020 |
Date | 11/3/2020 |
Location | Middle East |
Scope | The company announces its need for supply of Tube and Tube Bundle. COMPLETELY Assembled tube bundle for crude distillation units stabilizer re boiler exch.NO.E-13 as per DWG. NO. 1- EG. The,008010-01/2 and DWG.NO.109 -2513.180 bundle consist of 540 tubes 20MM ODX 2.3 MM min wall thickness X6002MM Straiht length tube material SA 213 GR .T 5. |
Bid Bond | US 6,000.00 |
Bond Validity | 120 days |
Offer Validity | 120 days |
Documents Price | ID 250,000.00 |