Scope |
The company invites all prospective suppliers and contractors for Potable Water Network Upgrade from DDP to FNDS. Scope of work involves carrying out all Front-End Engineering & Design (FEED) for Replacement of Existing Potable Water Pipelines (8", 4" and branch lines), New DM (Demineralized) Water Plant, New Concrete Tank at DSFA, New line to existing irrigation water tanks (3 numbers) from the new pipeline and Demolition of replaced lines and to produce a comprehensive FEED design package including the SOW for EPIC tender.
|