Location |
Das Island, Abu Dhabi - United Arab Emirates |
|
Investment |
2,500,000,000 USD |
|
Announced |
8/8/2005 |
|
Scope |
Adgas currently operates 3 LNG trains. Trains 1 & 2 were commissioned in 1977 and are now more than 25 years old. Train 3 was built in May 1994 and produces 3 million tons per annum (mtpa) of LNG. Adgas currently produces 5.149 mtpa of LNG and 1.667 mtpa of LPG.
Adgas is planning to set up a new 5 million tones per year (t/y) LNG Train to replace the existing Trains 1 & 2 in order to accommodate the additional feedstock anticipated from Adma-Ocpo as according to the study, Adgas decided that the upgrade of the existing Trains 1 & 2 is not a feasible option and suggested a base capacity option of 5 million t/y and an alternative option of up to 8 million t/y.
The scope of the project will include: 1- Inlet facility. 2- Gas sweetening & treatment plant includes dehydration and acid gas recovery units. 3- Liquefaction unit includes condensate and sulfur recovery units. 4- LPG recovery unit includes fractionation and storage facilities . 5- NGL extraction unit. 6- Offsites & utilities.
Some of the key equipment are: De-methanizer, De-ethanizer, De-propanizer, Cold box, Gas turbines, Compressors and drivers, Heat exchangers & Cryogenic heat exchangers, Air coolers, and Refrigerant coolers. |
|
|
|
|
|
|
|
|
Owners and Shareholders Project Developers Engineering & Consulting Contractors Product Vendors
|
|