|
Location |
Neutral Zone Saudi / Kuwait - Saudi Arabia |
|
Investment |
200,000,000 USD |
|
Announced |
10/3/2005 |
|
Scope |
Al-Khafji's first onshore package is part of the KJO program in the Divided Zone's (DZ) between Saudi Arabia and Kuwait to increase the region's crude oil output by 100,000 b/d to 700,000 b/d. The package also known as the Hout onshore facilities expansion and involves the construction of two large storage tanks, a buffer tank, pumping stations and flowlines. The two storage tanks will be built alongside existing storage facilities and will be connected by a 20-inch-diameter pipeline to ship loading facilities. |
|
|
|
|
|
|
|
Owners and Shareholders Project Developers Engineering & Consulting Contractors Product Vendors
|
|