The E.DIS subsidiary e.disnatur Erneuerbare Energien GmbH is building five new wind turbines in Mallnow near Frankfurt (Oder) in cooperation with GASAG AG. Construction will begin in October this year, with an investment of over 40 million euros. The 250-meter-high turbines will produce 68 gigawatt hours of green electricity annually, which can supply almost 17,000 households. In addition, the five wind turbines will save 26,000 tons of CO2 per year compared to the conventional electricity mix .
The wind turbines have a total output of 28 megawatts. The selected type of turbine is characterized by high performance and efficiency and is suitable for regions with medium to strong winds. Mallnow is an ideal location for generating energy from wind power. The turbines will be connected to the public grid in summer 2025. The GASAG Group is already developing and operating several renewable plants with photovoltaics and wind power.
Sebastian Noster, Managing Director of e.disnatur, adds: "With this project, e.disnatur is proud to make an important contribution to regional energy supply and to the implementation of the energy transition. Our strength lies in our close cooperation with municipalities and regional partners who value us as a reliable and experienced player. In Mallnow, together with GASAG, we are building state-of-the-art wind turbines that not only supply green electricity to thousands of households, but also significantly improve the region's CO2 balance . As a subsidiary of E.DIS AG, we specialize in the development and operation of wind farms and photovoltaic systems in Mecklenburg-Western Pomerania, Brandenburg, Saxony and Saxony-Anhalt. We rely on innovative technologies and sustainable solutions to make the region fit for the energy future. This project is a significant step towards a climate-neutral future, and we are convinced that the expansion of renewable energies will bring both ecological and economic sustainable benefits for the entire region."