Cuba Block 9: Operations Update
Source: www.gulfoilandgas.com 3/4/2025, Location: South America
Highlights
• Successful perforation job, all 196m fired.
• Acid stimulation commenced. Preliminary indications of positive impact.
• Acid wash operations ongoing to remove formation damage.
• Flow-testing to follow acid-wash.