Gulf Oil and Gas accountACCOUNT

Al Meashar-2 Well Testing Using a Jet Pump

Source: www.gulfoilandgas.com 1/12/2011, Location: Middle East

Al Meashar-2 well in Block 7, Yemen, was being drill stem tested using a jet pump over the basement target interval. Oil was produced at an estimated average of 145 barrels of oil per day. The well is currently shut in for further build-up tests and will then be suspended.

Al Meashar-2 is an appraisal well of the Al Meashar-1 oil discovery made in early 2010. The well has been drilled from the existing Al Meashar-1 well pad using Managed Pressure Drilling to minimise damage from drilling fluids in the reservoir. The planned total measured depth of the well is approximately 3,740 metres.

Logging, Perforating, Testing >>

Logging, Perforating, Testing News in Yemen >>

Morocco >>  5/21/2019 - Sound Energy, the Moroccan focused upstream gas company, reports that the previously announced TE-10 gas discovery at Tendrara in Eastern Morocco, alt...
Libya >>  5/14/2019 - Sirte Oil Company (SOC) has completed successful development drilling of well FF03-6 of the Gargaf gas formation within the Istiklal oilfield. Develop...

Morocco >>  5/8/2019 - Sound Energy, the Moroccan focused upstream gas company, provides an update on its on-going exploration progamme. ...
Tunisia >>  5/7/2019 - During a production test, SMG-1 well flowed, constrained by surface facilities, at a rate of over 2,000 barrels of oil per day and 5 million cubic fee...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Yemen Oil & Gas 1 >>  2 | 3 | 4 | 5 |

Oil & Gas Projects in Yemen >>

More News

Related Links

AE BH IL IQ JO KW LB OM QA SA SY YE
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.