Gharabi-1 Exploration Well, Offshore Mauritania

Source: www.gulfoilandgas.com 1/11/2011, Location: Africa

Roc Oil (Mauritania) Company, a wholly owned subsidiary of ROC, advises that the Maersk Deliverer rig started drilling the Gharabi-1 exploration well at 19:10 hours (Mauritania time) on 7 January 2011. At 06:00 hours on 9 January (Mauritania time) the well was drilling ahead at a measured depth of 2,418 metres.

Gharabi-1 is located in Block C6, offshore Mauritania, approximately 22 kilometres southwest of the Cormoran-1 discovery. The planned total depth of the well is approximately 4,880 metres and the well is located in a water depth of 1,791 metres.

Participating Interests in Block C6 are: PC Mauritania I Pty Ltd (Operator) 72.58%; Tullow Petroleum (Mauritania) Pty Ltd 22.42%; Roc Oil (Mauritania) Company 5.00%.


China >>  5/29/2025 - The cumulative drilling footage of Zhongyuan Petroleum Engineering Company this year has exceeded 1 million meters. Since the beginning of this year, ...
United States >>  5/28/2025 - Further to the Company's announcement on 20 May 2025, Mosman Oil and Gas Limited (AIM:MSMN) the helium, hydrogen and hydrocarbon exploration, developm...

United States >>  5/28/2025 - Conestoga Energy (“Conestoga” or the “Company”), the leading provider of low carbon intensity biofuel, today announced the successful completion of dr...
Spain >>  5/27/2025 - Prospex Energy plc, an AIM quoted investment company, is pleased to announce its audited Final Results for the year ended 31 December 2024 (the "year-...

United States >>  5/27/2025 - Southern Energy Corp. ("Southern" or the "Company") (TSXV:SOU)(AIM:SOUC), an established producer with natural gas and light oil assets in Mississippi...
Indonesia >>  5/23/2025 - Velesto Energy Berhad (‘Velesto’ or the ‘Group’), announced that it has secured a new drilling contract from PC Ketapang II Ltd , PC North Madura II L...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.