Calvalley Petroleum Provides Yemen Update

Source: www.gulfoilandgas.com 2/3/2004, Location: Middle East

Calgary, Alberta, February 3, 2004 - Calvalley Petroleum Inc., (TSX-V: CVI.A), announces that it has received approval from its Joint Venture partners and the Ministry of Oil and Minerals of the Republic of Yemen to commence with its first quarter exploration and development activities on Block 9.

The production testing of the Al Roidhat, Hiswah and Auqban oil discoveries will commence on February 15, 2004. Pumping equipment shipped from Canada in December 2003, has arrived in Yemen and all necessary materials and services to carry out comprehensive production testing have been secured. The tests will be conducted by an independent firm and the results submitted to a well recognized third party engineering firm for reserve determination.

The company has proposed an eleven well exploration and development program for the year 2004. The first of two appraisal wells in the Qishn oil structure at Al Roidhat, utilizing 95/8 inch production casing is scheduled to be spuded on February 28th . These two wells will be drilled to the basement in order to assess potential production opportunities below the Qishn formation. The wells are also expected to be put on production test immediately after drilling in order to better establish reserve parameters in this particular pool.

In early March the Company will initiate the acquisition of approximately 200 kilometers of new seismic data. The seismic will be shot over several new features identified for drilling later this year, as well as, over four of the existing discoveries in order to better delineate reserve boundaries in the different pools.

In order to accelerate the above program, the company has been granted an exemption from the normal tendering process which would have delayed the above program by approximately two months. This exemption, by the Ministry of Oil and Minerals, has been granted as a result of the very efficient and low cost manner in which Calvalley conducted its operations previously. The various first quarter activities will be carried out generally utilizing the same contractors employed previously by the Company.



China >>  5/30/2025 - 2012 meters, 2295 meters, 1860 meters. Since the beginning of May, the Repu 6-H6 well, Ha 13-H13 well, and Ha 13-H11 well in the Tarim Oilfield have b...
China >>  5/29/2025 - The cumulative drilling footage of Zhongyuan Petroleum Engineering Company this year has exceeded 1 million meters. Since the beginning of this year, ...

United States >>  5/28/2025 - Further to the Company's announcement on 20 May 2025, Mosman Oil and Gas Limited (AIM:MSMN) the helium, hydrogen and hydrocarbon exploration, developm...
United States >>  5/28/2025 - Conestoga Energy (“Conestoga” or the “Company”), the leading provider of low carbon intensity biofuel, today announced the successful completion of dr...

Spain >>  5/27/2025 - Prospex Energy plc, an AIM quoted investment company, is pleased to announce its audited Final Results for the year ended 31 December 2024 (the "year-...
United States >>  5/27/2025 - Southern Energy Corp. ("Southern" or the "Company") (TSXV:SOU)(AIM:SOUC), an established producer with natural gas and light oil assets in Mississippi...

Related Categories: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 

Related Articles: Artificial Lift  Cementing, Stimulation  Directional Drilling  Drilling  Drilling Engineering & Equipment Systems  Enhanced Oil Recovery  General  Logging, Perforating, Testing  Offshore Drilling  Reservoir/Completion Consultants  Workover & Well Services  Workover Rigs/Services 


Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.