Tekmar Begins Manufacturing Generation 10 CPS

Source: www.gulfoilandgas.com 1/26/2021, Location: Europe

Tekmar Energy has begun manufacturing its Generation 10 CPS for a number of recently awarded offshore wind projects in Europe.

The latest generation of our TekTube® system is already rolling off the production line following significant investment in our state-of-the-art production facility located in the North East of England, UK.


United States >>  2/1/2023 - Hellenic Cables, the cables segment of Cenergy Holdings and major provider of subsea cable solutions for global offshore wind, has finalized the indiv...
France >>  1/27/2023 - Correll Group, Cable Installation & Power Services Division is delighted to announce it has been awarded a contract with Asso.subsea, a specialized gl...

France >>  1/24/2023 - Aluminum producer Trimet and Nexans have laid the groundwork for improving the eco-balance of power cables. In a joint breakthrough development projec...
United Kingdom >>  1/24/2023 - Aberdeen-based Rotech Subsea has completed a cable de-burial, cut and recovery, and cable burial operations, at one of the world’s largest offshore wi...

United States >>  1/23/2023 - American Transmission Systems, Inc. (ATSI), a subsidiary of FirstEnergy Corp. (FE), has completed a 13-mile upgrade to a high-voltage transmission lin...
France >>  1/19/2023 - - Nexans has adopted Authentic Vision Meta-Anchor™ technology to secure Nexans products and supply chains and combat illicit trade.
- State-of-th...





Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.