Constructing the Dbessan Gas Station

Gas Processing
Reference 64/2010/A
Date 4/1/2011
Location Middle East
Scope
The company plans to further development the southern fields of North Middle Area Gas Exploitation Project. The project involves collecting non-associated gas from five drilled wells (AL Zamleh-1, AL Zamleh- 2, AL Zamleh-4, South AL Rasafa-1, and AL kalaa-1 to a Gas test separation station (DTSS) located at Dbessan site.

The collected gas from the DTSS will be pipelined to the north AL Hussein gas gathering station (NH station)location which is approximately 36kms far from the DTSS, the Pig receiver location at (NH station) is specified in the attached drawing. The proposed gathering system (DTSS)is located in a desert area with some gentle variations in the terrain.

Bidding Information

Bid Bond Euro 200000
Gas Processing
Related Prooducts: Gas Processing Deodorization system Gas dehydration Gas sweetening Gas Treating General GTL Processing LNG Processing LPG Domestic use LPG Odorless Packing Phase Separation Scrubbers
Related Tenders: Gas dehydration Gas sweetening Gas Treating General LNG Processing LPG Domestic use Packing Phase Separation Scrubbers