Scope |
The company invites all prospective suppliers and contractors for FEED for closure of existing landfill in Mesaieed. The project scope is to provide Front End Engineering Design (FEED) works in order that the existing landfill at Mesaieed can be closed in accordance with the best industrial standards and practices. In addition, all design's shall comply with MEE regulations, ensure safety and integrity of the closed landfill with minimum maintenance works and ensure protection of the environment. On completion of the FEED Design Works the contractor shall be responsible for preparing a comprehensive EPIC Tender package allowing QP to appoint a contractor to detail design and construct the Proposed Facility. |